A silver gold project in Central Peru with established underground access, confirmed metallurgical recoveries, and a six year community agreement registered with Peru’s public registry.

| Mercedes | Junín Department, Central Peru, 50% interest through San Maurizo Mines Ltd. |
| Access | Approximately 40 km by well maintained gravel road from Concepción |
| Property size | Approximately 1,345 hectares |
| Processing pathway | Local toll mill approximately 12 kilometres from the project |
| Historical workings | Approximately 900 metres of drifts and shafts |
| Key structures | Victor I, Victor II, Kelly and Charo veins |
Map shows the Aguila Norte plant and the Company’s Palta Dorada, Mercedes and Minas Visca projects. Minas Yanayco is not shown. Property area is subject to confirmation against the Company’s continuous disclosure.
Mercedes is a silver gold project in the Junín Department of Central Peru, covering approximately 1,345 hectares and accessible from the town of Concepción by approximately 40 kilometres of well maintained gravel road.
Peruvian Metals holds a 50% interest in San Maurizo Mines Ltd., a private company that owns a 100% direct interest in the Mercedes property through its wholly owned Peruvian subsidiary, Basic Minerals SAC. Development and exploration costs are shared equally with Hudson Heartland Ltd. Mineral from Mercedes is expected to be processed at a local toll mill located approximately 12 kilometres from the project.
| Ownership | 50% interest through San Maurizo Mines Ltd. |
| Underlying property | 100% held by Basic Minerals SAC, a wholly owned Peruvian subsidiary of San Maurizo |
| Joint venture partner | Hudson Heartland Ltd., costs shared equally |
| Commodity focus | Silver and gold |
| Location | Junín Department, Central Peru |
| Property size | Approximately 1,345 hectares |
| Access | Approximately 40 km by well maintained gravel road from Concepción |
| Processing pathway | Local toll mill approximately 12 km from the project |
| Historical workings | Approximately 900 metres of historical underground workings |
| Key structures | Victor I, Victor II, Kelly and Charo veins |
| Royalty | 20% net profit interest, eliminated once US$4 million has been paid to the holder |
Property area is subject to confirmation against the Company’s continuous disclosure.
Metallurgical work at Mercedes has focused on producing a single silver gold concentrate using flotation methods, with lead and zinc content determined to be less significant relative to silver and gold.
| Vein | Head grade, concentrate grade and recovery |
| Victor II composite | Head grade 3.69 g/t Au and 9.4 oz/t Ag. Concentrate 12.23 g/t Au and 33.03 oz/t Ag. Recoveries 92.19% Au and 97.85% Ag. Mineral to concentrate ratio 3.50:1. |
| Charo composite | Head grade 0.63 g/t Au and 6.10 oz/t Ag. Concentrate 4.01 g/t Au and 48.42 oz/t Ag. Recoveries 74.7% Au and 92.3% Ag. Mineral to concentrate ratio 8.54:1. |
Composite samples are not necessarily representative of mineralization across the property.

Mercedes contains extensive historical underground workings, including horizontal drifts and shafts totalling approximately 900 metres. Previous operators in the early 1980s focused on three main structures: Victor I, Victor II and the Kelly vein. Historic reports indicate that more than 15 mineralized structures have been identified. To date the Company has located six mineralized veins, including Victor II and Charo. The Victor II vein is exposed in two underground adit levels and ranges from approximately 0.30 metres to 1.0 metre in width as reported by Company geologists.
The Charo vein sits approximately 475 metres west of Victor II on the opposite side of a U shaped gully. A historic 45 metre adit was located, cleaned out and re-established for access.
Historical results and selective samples may not be representative of mineralization across the property.

Mercedes has secured a six year community agreement with the Comunidad Campesina de Pomamanta. The agreement has been accepted and registered with Sunarp, Peru’s public registry, and allows local access to the mine site for exploration and exploitation of minerals. With the community agreement and provisional permits in place, the Company is able to commence extraction of mineral for sale or processing, and expects to continue the permitting process toward full permits that would allow extraction of up to 350 tonnes per day at Mercedes.
The 350 tonnes per day figure refers to permitting at Mercedes and is separate from the capacity of the Aguila Norte processing plant.