An operating, fully permitted polymetallic processing plant in Northern Peru, generating revenue today and built to grow.
Located 10 km from the Pan-American Highway near Trujillo, Peru’s second largest city, the Aguila Norte plant has delivered five consecutive years of throughput growth, processing a record 36,616 tonnes during 2025 at full permitted capacity. The plant has generated over C$3 million in revenue in 2023, 2024 and 2025, and surface rights were renewed for a further 10 years in March 2026.
One of very few fully permitted polymetallic plants in Northern Peru.
C$0.88M income from plant operations in FY2026.
Operating at 100 tpd with engineering studies underway to expand throughput.
10-year surface rights renewed in March 2026.
A working plant near Trujillo, processing polymetallic material through crushing, milling, gravity and flotation circuits into high-grade concentrates.
The plant is already built and permitted. Engineering studies are underway to scale throughput beyond the current 100 tpd. Because the cost base is largely fixed, added volume is expected to translate directly into higher revenue and plant income, without building anything new.